Central Utility Plant Interconnect DSH REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project comprises labor, material and services necessary for: Major components of Project Work consist of demolition of existing 66kv outdoor substation including all ancillaries and the 12kv switchgear inside the co-generation plant. Provide new 5kv switchgear (with provision for future automation and controls) and utility metering section. Provide battery, battery charger, enclosure, and battery
- Status
- Closed
- Sector
- Manufacturing (Industrial), Energy Storage, Commercial, Power Generation (CCGT), Power Transmission
- Location
- Norwalk, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Central Utility Plant Interconnect DSH REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project comprises labor, material and services necessary for: Major components of Project Work consist of demolition of existing 66kv outdoor substation including all ancillaries and the 12kv switchgear inside the co-generation plant. Provide new 5kv switchgear (with provision for future automation and controls) and utility metering section. Provide battery, battery charger, enclosure, and battery calculation. Provide from spare circuit breaker of new switchgear temporary power supply to feed... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Norwalk |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Energy Storage, Commercial, Power Generation (CCGT), Power Transmission |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
