logo

Central YMCA energy infrastructure retrofit

Sector: Commercial • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Pre-Construction

This is an existing, 14,410 m2 mixed-use community and recreation centre owned by the YMCA of Greater Toronto (YMCA). It brings together the local community and features a wide range of health and fitness facilities and programs, a new immigrant services centre, youth programs, and day camps during school breaks. However, as an older building constructed in 1984, the building currently contains a

Project Information FAQ

Project Information

4 Q
The project “Central YMCA energy infrastructure retrofit” is an infrastructure initiative in the Commercial sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This is an existing, 14,410 m2 mixed-use community and recreation centre owned by the YMCA of Greater Toronto (YMCA). It brings together the local community and features a wide range of health and fitness facilities and programs, a new immigrant services centre, youth programs, and day camps during school breaks. However, as an older building constructed in 1984, the building currently contains a number of inefficient systems and building features, resulting in higher energy consumption and GHG emissions, as well as increased fuel cost. The project will implement a variety of repairs and retrofit measures to significantly reduce energy consumption and GHG emissions, which will ultimately result in a 38% reduction in fuel consumption, 32% reduction in fuel cost, and 49% reduction in carbon emissions. With these measures funded through the GICB program, this project is an excellent example of retrofitting existing buildings to convert them into modern, high-performance facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data