Centrales Termicas Mendoza SA
Sector: Government • Location: Badulla, Argentina
Source: World Bank Group
Centrales Termicas Mendoza SA had a 422-MW capacity in November 1995 when it was privatized. However, the plant produced only 153-MW due to the high level of deterioration. The company was partially privatized in October 1994 when a 51% equity stake was sold for US$45 million to CMS Generation (41%) and Ormas Saicic (10%). In addition, a 4% equity stake was sold to power plant's workers for $2.2 m
- Status
- Prospective
- Sector
- Government, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)
- Location
- Badulla, Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Centrales Termicas Mendoza SA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Centrales Termicas Mendoza SA had a 422-MW capacity in November 1995 when it was privatized. However, the plant produced only 153-MW due to the high level of deterioration. The company was partially privatized in October 1994 when a 51% equity stake was sold for US$45 million to CMS Generation (41%) and Ormas Saicic (10%). In addition, a 4% equity stake was sold to power plant's workers for $2.2 million, at the same share price that the winning consortium paid. By 1996, the equity structure was: 80% CMS Generation, 16% the government of Mendoza province, and 4% power plant workers. The company's privatization did not include a long-term concession agreement as was the case in most power privatizations in Argentina. In 1996, the company had an investment plan to increase the generating capacity from 274-MW to 506-MW. Such expansion required about $185 million investment. The capacity of the plant was increased to 540 MW in 1998. In 1996, Mendoza plant signed a two-year power-supply agreement with Energia Mendoza Sociedad del Estado (a local distribution utility) for the sale of 110-MW of capacity beginning in May 1996. When the contract expires, the plant will operate as a merchant plant and deliver its energy to Argentina's power pool. None None |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Argentina |
State | Badulla |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest: