Centrales Termicas Mendoza SA

Sector: Government • Location: Badulla, Argentina

Source: World Bank Group

Project
Active

Centrales Termicas Mendoza SA had a 422-MW capacity in November 1995 when it was privatized. However, the plant produced only 153-MW due to the high level of deterioration. The company was partially privatized in October 1994 when a 51% equity stake was sold for US$45 million to CMS Generation (41%) and Ormas Saicic (10%). In addition, a 4% equity stake was sold to power plant's workers for $2.2 m

Status
Prospective
Sector
Government, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)
Location
Badulla, Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Centrales Termicas Mendoza SA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Centrales Termicas Mendoza SA” is an infrastructure initiative in the Government sector, located in Badulla, Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Centrales Termicas Mendoza SA had a 422-MW capacity in November 1995 when it was privatized. However, the plant produced only 153-MW due to the high level of deterioration. The company was partially privatized in October 1994 when a 51% equity stake was sold for US$45 million to CMS Generation (41%) and Ormas Saicic (10%). In addition, a 4% equity stake was sold to power plant's workers for $2.2 million, at the same share price that the winning consortium paid. By 1996, the equity structure was: 80% CMS Generation, 16% the government of Mendoza province, and 4% power plant workers. The company's privatization did not include a long-term concession agreement as was the case in most power privatizations in Argentina. In 1996, the company had an investment plan to increase the generating capacity from 274-MW to 506-MW. Such expansion required about $185 million investment. The capacity of the plant was increased to 540 MW in 1998. In 1996, Mendoza plant signed a two-year power-supply agreement with Energia Mendoza Sociedad del Estado (a local distribution utility) for the sale of 110-MW of capacity beginning in May 1996. When the contract expires, the plant will operate as a merchant plant and deliver its energy to Argentina's power pool. None None

Original sector

Energy

Procurement method

Budget

Location

Country

Argentina

State

Badulla

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project