Centrales Termicas San Miguel de Tucuman
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The first project of Centrales Termicas San Miguel de Tucuman was a 114-MW gas fired power plant developed in the Province of Tucuman. The facility started its commercial operation in 1995. In 1995 the equity was divided among Charter Oak Energy (33.3%), LG&E Power (33.3% - a subsidiary of Merrill International), and Sideco Americana (33.3%). The total cost of the power project was $125 million. T
- Status
- Prospective
- Sector
- Commercial, Wind, Power Generation (CCGT), Natural Gas, Government
- Location
- Tucuman, Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Centrales Termicas San Miguel de Tucuman
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The first project of Centrales Termicas San Miguel de Tucuman was a 114-MW gas fired power plant developed in the Province of Tucuman. The facility started its commercial operation in 1995. In 1995 the equity was divided among Charter Oak Energy (33.3%), LG&E Power (33.3% - a subsidiary of Merrill International), and Sideco Americana (33.3%). The total cost of the power project was $125 million. The electricity produced by this plant is sold to the spot market in Argentina. The IFC approved an equity participation in Centrales Termicas San Miguel de Tucuman SA of about $0.3 million in its fiscal year 1994. In the fourth quarter of 2000 San Miguel received a $50 million loan for a 120 MW expansion of the generator. General Electric is supplying the turbine for the plant. None None |
Original sector | Energy |
Budget |
Location
Country | Argentina |
State | Tucuman |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Power Generation (CCGT), Natural Gas, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
