Centrally-funded Infrastructure Projects Cost Overruns
The owner, status and timeline of this project. A free account opens every field.
Source: Business Standard
Centrally-funded infrastructure projects in India have experienced cost overruns totaling ₹2.89 trillion as of June 2025. The ongoing projects are estimated at nearly ₹30 trillion, with roads leading at ₹7.3 trillion, followed by railways and petroleum sectors. Power and petroleum sectors saw overruns of over ₹60,000 crore each, while highways may cost ₹38,000 crore more. Maharashtra leads in proj
- Status
- Under Construction
- Sector
- Rail, Road, Power Generation (CCGT), Oil and Gas, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Business Standard
ConstructChat
Ask ConstructChat about Centrally-funded Infrastructure Projects Cost Overruns
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Centrally-funded infrastructure projects in India have experienced cost overruns totaling ₹2.89 trillion as of June 2025. The ongoing projects are estimated at nearly ₹30 trillion, with roads leading at ₹7.3 trillion, followed by railways and petroleum sectors. Power and petroleum sectors saw overruns of over ₹60,000 crore each, while highways may cost ₹38,000 crore more. Maharashtra leads in project value at ₹2.18 trillion, and Andhra Pradesh has the highest overrun at ₹48,351 crore. Projects worth ₹1,760 crore were frozen or dropped in June, including key ones in Himachal Pradesh and the Northeast. |
Original sector | Infrastructure |
Budget |
Location
Country | India |
Source
Source | Business Standard |
URL |
More Details
Record type | Project |
Sector | Rail, Road, Power Generation (CCGT), Oil and Gas, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
