Centre Jean-Daigle - Solar Panels
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
The project consists of the installation of solar panels on the roof of the Town’s new amphitheatre, in the area surrounding the amphitheatre, and on the Energy Edmundston building and surrounding land. The project also includes the construction and installation of an energy storage system. Not only does the Town of Edmundson run their own electrical distribution network, but their Energy service
- Status
- Under Construction
- Sector
- Water Supply and Storage, Solar, Power Generation (CCGT), Energy Storage, Commercial
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Centre Jean-Daigle - Solar Panels
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the installation of solar panels on the roof of the Town’s new amphitheatre, in the area surrounding the amphitheatre, and on the Energy Edmundston building and surrounding land. The project also includes the construction and installation of an energy storage system. Not only does the Town of Edmundson run their own electrical distribution network, but their Energy service is the only one in the Province of New Brunswick that produces a portion of their electricity. The are able to do this because of three central hydroelectric plants. The addition of a solar panel system and energy storage will be a first for the municipality, which wishes to produce energy from more renewable sources. The panels, once installed, will produce the equivalent of 1Mw of energy. This energy could be used to operate the building’s systems or to help manage energy during peak usage hours. For this project no vegetation clearing or grubbing will be necessary; the new infrastructure will be installed on existing cleared land or buildings. The civil works will require some excavation but will be situated far from any water bodies. This project will increase the Town’s capacity to produce and manage renewable energy. |
Original sector | Green Energy |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Solar, Power Generation (CCGT), Energy Storage, Commercial |
Article published date | 2026-04-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
