logo

Centre Jean-Daigle - Solar Panels

Sector: Solar • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

The project consists of the installation of solar panels on the roof of the Town’s new amphitheatre, in the area surrounding the amphitheatre, and on the Energy Edmundston building and surrounding land. The project also includes the construction and installation of an energy storage system. Not only does the Town of Edmundson run their own electrical distribution network, but their Energy service

Project Information FAQ

Project Information

5 Q
The project “Centre Jean-Daigle - Solar Panels” is an infrastructure initiative in the Solar sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the installation of solar panels on the roof of the Town’s new amphitheatre, in the area surrounding the amphitheatre, and on the Energy Edmundston building and surrounding land. The project also includes the construction and installation of an energy storage system. Not only does the Town of Edmundson run their own electrical distribution network, but their Energy service is the only one in the Province of New Brunswick that produces a portion of their electricity. The are able to do this because of three central hydroelectric plants. The addition of a solar panel system and energy storage will be a first for the municipality, which wishes to produce energy from more renewable sources. The panels, once installed, will produce the equivalent of 1Mw of energy. This energy could be used to operate the building’s systems or to help manage energy during peak usage hours. For this project no vegetation clearing or grubbing will be necessary; the new infrastructure will be installed on existing cleared land or buildings. The civil works will require some excavation but will be situated far from any water bodies. This project will increase the Town’s capacity to produce and manage renewable energy.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data