Centurion Call Center Building
Start · Indiana · Last reported Dec 2024
Source: Dodge USA
Eagle Contracting, Inc. Centurion Call Center Remodel To Include Build Approx 20lf Of New Walls. No Demo Of Walls. Ceiling Grid And Tiles, Mechanicals As Needed. Affidavits Rec''d. Drawings Rec''d. Electrical: Undefined Framing: Undefined Heating: Undefined Plumbing: Undefined
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial, Power Generation (CCGT)
- Location
- Fort Wayne, Indiana, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Centurion Call Center Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Eagle Contracting, Inc. Centurion Call Center Remodel To Include Build Approx 20lf Of New Walls. No Demo Of Walls. Ceiling Grid And Tiles, Mechanicals As Needed. Affidavits Rec''d. Drawings Rec''d. Electrical: Undefined Framing: Undefined Heating: Undefined Plumbing: Undefined |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Fort Wayne |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial, Power Generation (CCGT) |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
