logo
ProjectCompleted

Century Hydros

Completed · Colombia

Source: International Finance Corporation (IFC)

The project consists of two small run-of-river hydros located in the basin of the Guadalupe river, 95 km north of Medellin, in the west part of Colombia. The two projects, Caruquia (9.5 MW) and Guanaquitas (9.8 MW), are being developed by Century Energy Corporation (Century). The Guadalupe River currently serves 3 hydropower plants totaling 512 MW, which are owned by Empresas Publicas de Medellin

Status
Closed
Sector
Water Supply and Storage, Hydro, Cement, Government
Location
Colombia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Century Hydros

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Century Hydros” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of two small run-of-river hydros located in the basin of the Guadalupe river, 95 km north of Medellin, in the west part of Colombia. The two projects, Caruquia (9.5 MW) and Guanaquitas (9.8 MW), are being developed by Century Energy Corporation (Century). The Guadalupe River currently serves 3 hydropower plants totaling 512 MW, which are owned by Empresas Publicas de Medellin (EPM). The project is located upstream from such plants, Guanaquitas being located 6 km downstream from Caruquia. The project is technically simple with low construction risk, and includes for Caruquia the construction of a 4 meter-high, 35 meter-wide concrete intake dam and for Guanaquitas the construction of a 4 meter high and 24 meter-wide intake dam. Designs, procurement and supervision of construction will be done by HMV, a company that is part of the Helm Group. HMV is one of the largest engineering consulting firms in Colombia, having participated in the design and supervision of more than 20 energy related EPC projects.

Original sector

BB - Small Hydro (<10MW) - Renewable Energy Generation

Procurement method

Location

Country

Colombia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Cement, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project