logo

Cenxi City transportation improvement project

Sector: Road • Location: China

Source: World Bank Group

Project
Active

This project contains 5 sub-projects, namely: Cenxi City Road to Botang Class II Highway Project, Daye to Limu Highway Project, Daye to Sincerity Highway Project, Jinzhu to Xichuangyuan Highway Project, West Section of Yuwu Avenue in Cenxi City Comprehensive road reconstruction project (from Sihu intersection to the intersection of freight train station). The road from Cenxi City Road to Botang Cl

Project Information FAQ

Project Information

4 Q
The project “Cenxi City transportation improvement project” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project contains 5 sub-projects, namely: Cenxi City Road to Botang Class II Highway Project, Daye to Limu Highway Project, Daye to Sincerity Highway Project, Jinzhu to Xichuangyuan Highway Project, West Section of Yuwu Avenue in Cenxi City Comprehensive road reconstruction project (from Sihu intersection to the intersection of freight train station). The road from Cenxi City Road to Botang Class II Highway has a total length of 16.690km, a design speed of 60km/h, and a roadbed width of 10m. The road from Daye to Limu Road has a total length of 19.165km, a design speed of 40km/h, a two-way two-lane road, and a roadbed width of 8.5m. The Daye Zhichengjian Highway Project has a total length of 22.262km and a roadbed width of 10m. The total length of the Jinzhu-Xichuangyuan highway project is 5.933km, the design speed is 60km/h, the two-way two-lane road, and the subgrade width is 12m. The comprehensive reconstruction project of the west section of Yuwu Avenue in Cenxi City is an urban main road with a total length of 3,90.559m, a standard section red line width of 36m, four lanes in both directions, and a design speed of 40km/h. The total investment of the project is $ 200.06 million. Type of concession is BOT with a period of 18 years. Financial close took place on December 22, 2020. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/1629a7d7dac941d3b3ae48f1621eacb5

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data