logo

Cenxi City transportation improvement project

Sector: Road • Location: China

Source: World Bank Group

Project
Active

This project contains 5 sub-projects, namely: Cenxi City Road to Botang Class II Highway Project, Daye to Limu Highway Project, Daye to Sincerity Highway Project, Jinzhu to Xichuangyuan Highway Project, West Section of Yuwu Avenue in Cenxi City Comprehensive road reconstruction project (from Sihu intersection to the intersection of freight train station). The road from Cenxi City Road to Botang Cl

Status
Prospective
Sector
Road, Rail, Government, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cenxi City transportation improvement project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cenxi City transportation improvement project” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project contains 5 sub-projects, namely: Cenxi City Road to Botang Class II Highway Project, Daye to Limu Highway Project, Daye to Sincerity Highway Project, Jinzhu to Xichuangyuan Highway Project, West Section of Yuwu Avenue in Cenxi City Comprehensive road reconstruction project (from Sihu intersection to the intersection of freight train station). The road from Cenxi City Road to Botang Class II Highway has a total length of 16.690km, a design speed of 60km/h, and a roadbed width of 10m. The road from Daye to Limu Road has a total length of 19.165km, a design speed of 40km/h, a two-way two-lane road, and a roadbed width of 8.5m. The Daye Zhichengjian Highway Project has a total length of 22.262km and a roadbed width of 10m. The total length of the Jinzhu-Xichuangyuan highway project is 5.933km, the design speed is 60km/h, the two-way two-lane road, and the subgrade width is 12m. The comprehensive reconstruction project of the west section of Yuwu Avenue in Cenxi City is an urban main road with a total length of 3,90.559m, a standard section red line width of 36m, four lanes in both directions, and a design speed of 40km/h. The total investment of the project is $ 200.06 million. Type of concession is BOT with a period of 18 years. Financial close took place on December 22, 2020. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/1629a7d7dac941d3b3ae48f1621eacb5

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Rail, Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project