Cenxi City transportation improvement project
Sector: Road • Location: China
Source: World Bank Group
This project contains 5 sub-projects, namely: Cenxi City Road to Botang Class II Highway Project, Daye to Limu Highway Project, Daye to Sincerity Highway Project, Jinzhu to Xichuangyuan Highway Project, West Section of Yuwu Avenue in Cenxi City Comprehensive road reconstruction project (from Sihu intersection to the intersection of freight train station). The road from Cenxi City Road to Botang Cl
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project contains 5 sub-projects, namely: Cenxi City Road to Botang Class II Highway Project, Daye to Limu Highway Project, Daye to Sincerity Highway Project, Jinzhu to Xichuangyuan Highway Project, West Section of Yuwu Avenue in Cenxi City Comprehensive road reconstruction project (from Sihu intersection to the intersection of freight train station). The road from Cenxi City Road to Botang Class II Highway has a total length of 16.690km, a design speed of 60km/h, and a roadbed width of 10m. The road from Daye to Limu Road has a total length of 19.165km, a design speed of 40km/h, a two-way two-lane road, and a roadbed width of 8.5m. The Daye Zhichengjian Highway Project has a total length of 22.262km and a roadbed width of 10m. The total length of the Jinzhu-Xichuangyuan highway project is 5.933km, the design speed is 60km/h, the two-way two-lane road, and the subgrade width is 12m. The comprehensive reconstruction project of the west section of Yuwu Avenue in Cenxi City is an urban main road with a total length of 3,90.559m, a standard section red line width of 36m, four lanes in both directions, and a design speed of 40km/h. The total investment of the project is $ 200.06 million. Type of concession is BOT with a period of 18 years. Financial close took place on December 22, 2020. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/1629a7d7dac941d3b3ae48f1621eacb5 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
