CEPP Reservoir Embankment SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Palm Beach, Florida, United States of America
Source: Dodge USA
The work includes clearing, grubbing, demucking, blasting, excavation and processing of several million cubic yards of earthen material for the construction of a 17.3 miles-long embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above natural grade in the south. Work will also include construction of four (4) multi-barrel, gated
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CEPP Reservoir Embankment SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes clearing, grubbing, demucking, blasting, excavation and processing of several million cubic yards of earthen material for the construction of a 17.3 miles-long embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above natural grade in the south. Work will also include construction of four (4) multi-barrel, gated outlet-work structures, as well as one (1) multi-bay, gated inline-spillway. In addition, the wor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm Beach |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
