logo
ProjectFully Disbursed

CEPS TRANSMISSION GRID II

Fully disbursed · Czechia

Source: European Investment Bank (EIB)

Multi component investment programme covering the period 2016-2020 aimed at reinforcing the electricity transmission infrastructure of the Czech Republic.

Status
Closed
Sector
Power Generation (CCGT)
Location
Czech Republic
Updated
22 Jul 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about CEPS TRANSMISSION GRID II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CEPS TRANSMISSION GRID II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Czechia. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Not available for this record.

Status

Original status

fully disbursed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Multi component investment programme covering the period 2016-2020 aimed at reinforcing the electricity transmission infrastructure of the Czech Republic.

Original sector

Energy

Location

Country

Czech Republic

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project