logo
ProjectPending

CEPU UCL

Pending · Argentina

Source: International Finance Corporation (IFC)

The proposed investment consists of a 9-year senior loan of up to USD 300 million to Central Puerto S.A. ("CEPU" or the "Company"), a longstanding client of IFC. The loan will include a US$ 50 million A Loan and US$ 250 million mobilized through B Loans and/or Parallel Loans. The use of proceeds will support CEPU’s capital expenditure plan, which includes: (i) the acquisition of the Piedra del Águ

Status
Prospective
Sector
Energy Storage, Hydro, Geothermal, Bridge, Commercial, Wind, Cement, Road, Solar, Water Supply and Storage, Warehouse, Power Generation (CCGT), Natural Gas, Hotel, Government
Location
Argentina
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about CEPU UCL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CEPU UCL” is an infrastructure initiative in the Energy Storage sector, located in Argentina. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed investment consists of a 9-year senior loan of up to USD 300 million to Central Puerto S.A. ("CEPU" or the "Company"), a longstanding client of IFC. The loan will include a US$ 50 million A Loan and US$ 250 million mobilized through B Loans and/or Parallel Loans. The use of proceeds will support CEPU’s capital expenditure plan, which includes: (i) the acquisition of the Piedra del Águila hydroelectric power plant (the HPP) on the Limay River, in Neuquen, Argentina, built between 1985 and 1993, and operated by CEPU since the beginning of operations , and (ii) the installation of a 150 MW Battery Energy Storage System (“BESS”) to be located next to CEPU’s Nuevo Puerto Thermal Powerplant in Buenos Aires (together, the “Project”). The HPP has an installed capacity of 1,440 MW. It consists of a concrete gravity dam with a maximum height of 170 meters, and a powerhouse equipped with four generating units of 360 MW each. The facility includes intakes and penstocks, a spillway, bottom outlets, and associated operational infrastructure such as access roads, a bridge, and electric power supply systems. Since commencing commercial operation, the plant has historically produced an average of 4,439 GWh per year. The Nuevo Puerto BESS will have an initial energy storage capacity of 750 MWh, enabling it to deliver 150 MW of power for 5 continuous hours. Central Puerto S.A. is a leading Argentine energy company engaged in electricity generation through thermal, hydroelectric, wind, and solar power, and is also involved in natural gas transport, distribution, and forestry activities.

Original sector

V-BG - Renewable Funds - Renewable Energy Generation

Location

Country

Argentina

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Energy Storage, Hydro, Geothermal, Bridge, Commercial, Wind, Cement, Road, Solar, Water Supply and Storage, Warehouse, Power Generation (CCGT), Natural Gas, Hotel, Government

Article published date

2025-12-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project