Cesar Chavez Elementary School Technology Upgrade
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project is generally described as: Technology and data upgrades that include but are not limited to the demolition of the existing MDF rack in Room 209 and the existing IDF wall cabinet in modular building B1. A new MDF build-out in room 112, a new IDF build-out in room 209, and a new outdoor IDF outside exterior rack near the modular building B1. Additional electrical work to support expansio
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Education, Government, Manufacturing (Industrial)
- Location
- San Francisco, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cesar Chavez Elementary School Technology Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is generally described as: Technology and data upgrades that include but are not limited to the demolition of the existing MDF rack in Room 209 and the existing IDF wall cabinet in modular building B1. A new MDF build-out in room 112, a new IDF build-out in room 209, and a new outdoor IDF outside exterior rack near the modular building B1. Additional electrical work to support expansion, alongside the installation of new data network equipment and connections to accommodate expand... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Francisco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Education, Government, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
