Cesar Chavez Pathway Project
Design · California
Source: City of Berkeley
The Cesar Chavez Park Perimeter Pathway Project is a renovation project funded by a State of California Coastal Conservancy Grant. It involves renovating the perimeter pathway starting from the Spinnaker Way Traffic Circle, following the perimeter pathway around the Western, Northern, and Eastern San Francisco Bay Shoreline of Cesar Chavez Park. The existing AC-pavement will be replaced with a new
- Status
- Prospective
- Sector
- Road, Government
- Location
- Berkeley, California, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Berkeley
ConstructChat
Ask ConstructChat about Cesar Chavez Pathway Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Cesar Chavez Park Perimeter Pathway Project is a renovation project funded by a State of California Coastal Conservancy Grant. It involves renovating the perimeter pathway starting from the Spinnaker Way Traffic Circle, following the perimeter pathway around the Western, Northern, and Eastern San Francisco Bay Shoreline of Cesar Chavez Park. The existing AC-pavement will be replaced with a new AC-pavement surface. |
Location
Country | United States of America (USA) |
State | California |
City | Berkeley |
Source
Source | City of Berkeley |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-10-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
