Cesbe S.A. Engenharia e Empreendimentos
Sector: Hydro • Location: Brazil
Source: World Bank Group
The Brazilian company Cesbe S.A. Engenharia e Empreendimentos was granted three authorizations to build small hydro power plants located in the state of Rio Grande do Sul (37 MW in total capacity). The 30-year contracts were signed with the regulatory agency ANEEL over the years starting in December 2000.
The first contract signed was for the Carlos Gonzatto Plant, which was set to have a ca
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cesbe S.A. Engenharia e Empreendimentos
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company Cesbe S.A. Engenharia e Empreendimentos was granted three authorizations to build small hydro power plants located in the state of Rio Grande do Sul (37 MW in total capacity). The 30-year contracts were signed with the regulatory agency ANEEL over the years starting in December 2000. The first contract signed was for the Carlos Gonzatto Plant, which was set to have a capacity of 9 MW. Construction works on this plant started in October 2004, and the unit became operational in June 2006. The sponsor created the company Campo Novo Energia S.A. to manage this project. Two other small power plant projects were authorized since then: Marco Baldo (16 MW) and Toca do Tigre (12 MW). Only Marco Baldo power plant started to be built (Marco Baldo). In 2005, the estimated investment in the Carlos Gonzatto Plant was worth US$ 10 million (BRL 25 million). In December 2005, Cesbe signed a US$ 6.3 million (BRL 15.4 million) contract with BNDES to finance this project. CESBE signed power purchase agreements for the CArlos Gonzatto power plants with the state-owned company Eletrobras. The agreements were set to last for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies). In 2010, constructions works of PCH Marco Baldo commenced. The investment at this power plant was estimated at US$ 45.4 million (BRL 80 million. Commercial operations began in June 2011. The construction works of PCH Toca do Tigre commenced in 2012 and were concluded in late 2012. Commercial operations of this power plant began in February 2013. The investment amount was estimated at US$ 92.2 million (BRL 180 million). |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.
