logo
ProjectActive

CG CdB II

Sector: Natural Gas • Location: Senegal

Source: IFC Project Disclosures

The proposed project, developed by ContourGlobal Cap des Biches (CG CdB or the Company), is a 33 MW capacity project to extend an existing IFC project (IFC project #35175), a 53 MW combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal (the “ Initial Project”) under construction since 2015. Together the Projects will operate on heavy fuel oil with an o

Status
Prospective
Sector
Natural Gas, Power Generation (CCGT), Geothermal, Oil and Gas, Residential
Location
Senegal
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about CG CdB II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CG CdB II” is an infrastructure initiative in the Natural Gas sector, located in Senegal. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed project, developed by ContourGlobal Cap des Biches (CG CdB or the Company), is a 33 MW capacity project to extend an existing IFC project (IFC project #35175), a 53 MW combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal (the “ Initial Project”) under construction since 2015. Together the Projects will operate on heavy fuel oil with an option to convert to natural gas. The Extension will be located adjacent to the Initial Project and within the permitted footprint of 2.99 ha, in the municipality of Rufisque West, therefore requiring no additional land. The closest residential area is the Darou Salum Azur district located 400 m to the East of the project area, and with an estimated population of 4,000 people. The technical configuration, contractual and construction arrangements of the Extension are broadly the same as for the Initial Project: i) same engines (Wartsila 18V46), ii) same contractor (Wartsila) for the Engineering Procurement and Construction (EPC), and iii) same operation & maintenance arrangements. Extension works started on January, 2016 with plant start-up scheduled for September 2016. In 2015, IFC provided financing for the construction of the Initial Project. The proposed financing for the Extension is to provide a cross-currency swap of a loan equivalent of up to US$ 4 m. This Environmental and Social Review Summary (ESRS) is an update of the ESRS prepared for the Initial Project (IFC project #35175) disclosed on May 4, 2015. Both CG CdB and the EPC contractor managed the construction of the Initial Project well and it is expected to be completed by late May 2016. The Initial Project has been materially compliant with the E&S requirements of IFC.

Original sector

V-AC - Heavy Fuel Oil - Thermal Power Generation

Location

Country

Senegal

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Natural Gas, Power Generation (CCGT), Geothermal, Oil and Gas, Residential

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project