The proposed project, developed by ContourGlobal Cap des Biches (CG CdB or the Company), is a 33 MW capacity project to extend an existing IFC project (IFC project #35175), a 53 MW combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal (the “ Initial Project”) under construction since 2015. Together the Projects will operate on heavy fuel oil with an option to con

Project Information FAQ

Project Information

4 Q
The project “CG CdB II” is an infrastructure initiative in the Water Supply and Storage sector, located in Senegal. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project, developed by ContourGlobal Cap des Biches (CG CdB or the Company), is a 33 MW capacity project to extend an existing IFC project (IFC project #35175), a 53 MW combined cycle thermal power plant located in Rufisque (23 km east of Dakar) in Senegal (the “ Initial Project”) under construction since 2015. Together the Projects will operate on heavy fuel oil with an option to convert to natural gas. The Extension will be located adjacent to the Initial Project and within the permitted footprint of 2.99 ha, in the municipality of Rufisque West, therefore requiring no additional land. The closest residential area is the Darou Salum Azur district located 400 m to the East of the project area, and with an estimated population of 4,000 people. The technical configuration, contractual and construction arrangements of the Extension are broadly the same as for the Initial Project: i) same engines (Wartsila 18V46), ii) same contractor (Wartsila) for the Engineering Procurement and Construction (EPC), and iii) same operation & maintenance arrangements. Extension works started on January, 2016 with plant start-up scheduled for September 2016. In 2015, IFC provided financing for the construction of the Initial Project. The proposed financing for the Extension is to provide a cross-currency swap of a loan equivalent of up to US$ 4 m. This Environmental and Social Review Summary (ESRS) is an update of the ESRS prepared for the Initial Project (IFC project #35175) disclosed on May 4, 2015. Both CG CdB and the EPC contractor managed the construction of the Initial Project well and it is expected to be completed by late May 2016. The Initial Project has been materially compliant with the E&S requirements of IFC.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data