logo

CG Rep. LISUNGI Safety Nets System Project

Sector: Residential • Location: Congo, Republic of

Source: World Bank Group

Project
Closed

The objective of the LISUNGI Safety Nets Project for Republic of Congo is to establish the key building blocks of a national safety net program and pilot a cash transfer program to improve access to health and education services of poorest households in participating areas. The project has three components. (1) Establishment of key building blocks of a national safety net program and enhancement o

Project Information FAQ

Project Information

5 Q
The project “CG Rep. LISUNGI Safety Nets System Project” is an infrastructure initiative in the Residential sector, located in Congo, Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the LISUNGI Safety Nets Project for Republic of Congo is to establish the key building blocks of a national safety net program and pilot a cash transfer program to improve access to health and education services of poorest households in participating areas. The project has three components. (1) Establishment of key building blocks of a national safety net program and enhancement of local capacities component will cover the setting up of the basic elements of long-term sustainable and effective national safety net system. This component will include activities to strengthen the institutions needed for coordinating, implementing, and monitoring the government's safety net system. (2) Strengthening the demand-side of services through cash transfer program component will support the development and implementation of a cash transfer program, which is expected to become the cornerstone of the social safety net system in the country. (3) Project management, monitoring and evaluation component will ensure that the LISUNGI team is operational and implements the project in conformity with the Financing Agreement, the project document, and the project implementation manual (PIM). This component will finance: (i) the hiring of staff (non-civil servant) including operational costs at the central and CAS levels; (ii) equipment and operating costs for LISUNGI directly linked to the daily management of the project (office space, utilities and supplies, communications, vehicle operation, maintenance and insurance, rehabilitation and equipment maintenance costs, and travel and supervision costs) at the central and CAS levels; (iii) regular internal audits and annual external audits (in accordance with the Bank's legal requirements for audits of financial and procurement aspects); (iv) the training of LISUNGI personnel at the central and CAS levels in general aspects of social safety net programs such as financial and procurement matters and other capacity-building activities such as participation in South-South forums; and (v) the development of project manuals and procedures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data