logo
ProjectActive

CG Togo

Active · Togo

Source: International Finance Corporation (IFC)

_x000C_ContourGlobal Togo S.A. (the “Company” or “CG Togo”) is the local subsidiary of ContourGlobal which develops and operates electric power and district heating businesses around the world. CG Togo has entered into a 25-year concession and power purchase agreement to develop, construct and operate a 100 MW thermal power plant on a brown-field site in Lomé, Togo (the “Project”). The Project wil

Status
Prospective
Sector
Water Supply and Storage, Oil and Gas, Government, Hospital, Manufacturing (Industrial), Road, Geothermal, Hydro, Waste Processing and Treatment, Power Generation (CCGT), Natural Gas
Location
Togo
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about CG Togo

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CG Togo” is an infrastructure initiative in the Water Supply and Storage sector, located in Togo. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

_x000C_ContourGlobal Togo S.A. (the “Company” or “CG Togo”) is the local subsidiary of ContourGlobal which develops and operates electric power and district heating businesses around the world. CG Togo has entered into a 25-year concession and power purchase agreement to develop, construct and operate a 100 MW thermal power plant on a brown-field site in Lomé, Togo (the “Project”). The Project will be the first substantial foreign investment in Togo in over a decade and will be one of the most significant investments in the West African power sector in over twenty years. CG Togo will be capable of producing up to ~780 gigawatt hours (GWh) of electricity per annum which it will sell to the Togolese electric distribution company, Compagnie Energie Electrique du Togo (CEET). Construction began in May 2009 and is expected to be completed and operational in April 2010. The plant will be powered by six Wärtsilä 18V50DF engines (16.6 MW each), with tri-fuel burning capability to operate on natural gas (NG), heavy fuel oil (HFO), and distillate diesel oil (DDO). HFO will be the primary source of fuel until NG becomes available via the West African Gas Pipeline. In December 2008, the Overseas Private Investment Corporation (OPIC) signed a US$146 million non–recourse loan agreement with CG Togo. Financial closing was reached in May 2009. IFC is considering a 20% equity stake in the project.

Original sector

AE - Multi Fuel - Thermal Power Generation

Location

Country

Togo

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Oil and Gas, Government, Hospital, Manufacturing (Industrial), Road, Geothermal, Hydro, Waste Processing and Treatment, Power Generation (CCGT), Natural Gas

Article published date

2026-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project