CGB Seattle Slip 36 CERCLA Cleanup & Waterfront Recap Ph 1A
Sector: Waste Processing and Treatment • Location: Seattle, Washington, United States of America
Source: Dodge
This Design-Bid Build projects requires a CERCLA clean-up effort and waterfront recapitalization at Base Seattle to support the homeporting of new USCG Polar Security Cutters. This effort is Phase 1A. Phase 1A includes, but is not limited to, the demolition of an existing building and pier (Building 3 and Pier 36, respectively), upgrading the fendering system and existing utilities, replacing and
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Seaport, Commercial
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CGB Seattle Slip 36 CERCLA Cleanup & Waterfront Recap Ph 1A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Design-Bid Build projects requires a CERCLA clean-up effort and waterfront recapitalization at Base Seattle to support the homeporting of new USCG Polar Security Cutters. This effort is Phase 1A. Phase 1A includes, but is not limited to, the demolition of an existing building and pier (Building 3 and Pier 36, respectively), upgrading the fendering system and existing utilities, replacing and reconfiguring floating docks and boathouse (5,000 sq ft) , as well as dredging and disposing of c... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Seaport, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
