CGES - OHL Vilusi-Herceg Novi
Sector: Power Generation (CCGT) • Location: Montenegro
Source: European Bank for Reconstruction and Development (EBRD)
The European Bank for Reconstruction and Development (the “EBRD” or the “Bank”) is considering providing finance to CRNOGORSKI ELEKTROPRENOSNI SISTEM AD(“CGES”, or “the Borrower”), the Montenegrin transmission system operator. CGES owns and operates substations and transmission lines at 400kV, 220kV, and 110kV voltage level. It has a transmission network that consists of 59 lines, about 1,512 km l
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | exploratory |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The European Bank for Reconstruction and Development (the “EBRD” or the “Bank”) is considering providing finance to CRNOGORSKI ELEKTROPRENOSNI SISTEM AD(“CGES”, or “the Borrower”), the Montenegrin transmission system operator. CGES owns and operates substations and transmission lines at 400kV, 220kV, and 110kV voltage level. It has a transmission network that consists of 59 lines, about 1,512 km long. Total transformation capacity comprises 4,166 MVA (with a total of 55 transformer units). The proceeds of the Bank's investment will be used as follows: The Project is expected to result in significant environmental benefits through increased efficiency of the national grid operation, associated reduction of transmission losses, and CO2 emissions. Download English package in Zip format Download Montenegrin package in Zip format Full ESIA documentation is available locally at: Podgorica Resident Office, Moskovska 2/B, 81000 Podgorica, Montenegro, Tel: +382 20 237 173, Fax: +382 20 237 195 and Client website Environmental or social enquiries CGES - Project Implementation Unit Address: Bul. Sv. Petra Cetinjskog 18 Tel.: +382 20 407-682 E-mail: office@cges.me |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
