logo
ProjectPassed Final Review, Pending Approval

CGES BIH-MNE-ALB 220kv OHL reconductoring

Sector: Commercial • Location: Montenegro

Source: European Bank for Reconstruction and Development (EBRD)

The EBRD is considering providing a sovereign-guaranteed loan of up to €15 million to Crnogorski Elektroprenosni Sistem AD ("CGES", or "the Company"). The proceeds of the EBRD financing will be used to support the upgrade of the Trebinje (BIH) - Peruiica (MNE) - Podgorica (MNE) - Vau i Dejes (ALB) power transmission corridor, increasing its capacity from approximately 300 MW to 600 MW. The upgrade

Status
Prospective
Sector
Commercial, Residential, Energy Storage, Mass Transit, Rail, Power Generation (CCGT), Hydro, Power Transmission, Government
Location
Montenegro
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about CGES BIH-MNE-ALB 220kv OHL reconductoring

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CGES BIH-MNE-ALB 220kv OHL reconductoring” is an infrastructure initiative in the Commercial sector, located in Montenegro. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

passed final review, pending approval

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The EBRD is considering providing a sovereign-guaranteed loan of up to €15 million to Crnogorski Elektroprenosni Sistem AD ("CGES", or "the Company"). The proceeds of the EBRD financing will be used to support the upgrade of the Trebinje (BIH) - Peruiica (MNE) - Podgorica (MNE) - Vau i Dejes (ALB) power transmission corridor, increasing its capacity from approximately 300 MW to 600 MW. The upgrade will primarily involve replacing existing conductors with High Temperature Low Sag (HTLS) conductors along the 220 kV overhead transmission line that runs through Montenegro, from the border with Bosnia and Herzegovina, through key substations at the Peruiica hydropower plant and the main Podgorica substation, to the border with Albania.

Original sector

Energy

Budget

Location

Country

Montenegro

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Commercial, Residential, Energy Storage, Mass Transit, Rail, Power Generation (CCGT), Hydro, Power Transmission, Government

Article published date

2025-11-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project