cGMP Temp-Controlled Facility
The owner, status and timeline of this project. A free account opens every field.
Source: Contract Pharma
Frontier Scientific Solutions has commenced construction of a cGMP temperature-controlled facility at Wilmington International Airport, aiming to be the largest of its kind in North America. The facility will enhance the efficiency and security of transporting temperature-sensitive pharmaceutical products, establishing a direct global gateway for life sciences between North America and Europe.
- Status
- Under Construction
- Sector
- Airport
- Location
- Wilmington, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Contract Pharma
ConstructChat
Ask ConstructChat about cGMP Temp-Controlled Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Frontier Scientific Solutions has commenced construction of a cGMP temperature-controlled facility at Wilmington International Airport, aiming to be the largest of its kind in North America. The facility will enhance the efficiency and security of transporting temperature-sensitive pharmaceutical products, establishing a direct global gateway for life sciences between North America and Europe. |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wilmington |
Source
Source | Contract Pharma |
URL |
More Details
Record type | Project |
Sector | Airport |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
