logo

CGN Baiyangba Wind Farm Renovation and Upgrading Project (99.5MW)

Sector: Wind • Location: China

Source: World Bank Group

Project
Active

The project comprises the renovation and upgrading of the CGN Baiyangba Wind Farm in Baiyangba Town, Lichuan City, Hubei Province, China. It is a pilot project of China General Nuclear Power Group (CGN) and aims to renovate and expand the capacity of the existing farm, reaching 99.5MW after the upgrades. The total investment of the project is $45.9m or 328.67 million yuan. The work started on Aug

Project Information FAQ

Project Information

4 Q
The project “CGN Baiyangba Wind Farm Renovation and Upgrading Project (99.5MW)” is an infrastructure initiative in the Wind sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the renovation and upgrading of the CGN Baiyangba Wind Farm in Baiyangba Town, Lichuan City, Hubei Province, China. It is a pilot project of China General Nuclear Power Group (CGN) and aims to renovate and expand the capacity of the existing farm, reaching 99.5MW after the upgrades. The total investment of the project is $45.9m or 328.67 million yuan. The work started on August 16, 2024. The original CGN Hubei Lichuan Baiyangba Wind Farm Project started construction in 2013, and all 31 wind turbines were connected to the grid for power generation in 2014. The project has been generating electricity for 10 years. 11 original 1.6-MW turbines will be dismantled and 10 new 6.25-MW and 1 5-MW will be built on the original site. Two 6.25MW and one 5MW wind turbines will be added to the original 110kV Dongsheng substation of the Baiyangba Wind Farm. After the completion of the project, the grid-connected power generation will increase by 133.29 million kWh, the annual equivalent full load hours will be 1,983 hours. Based on the standard coal consumption of 320g/kWh, the country can save 42,105 tons of standard coal each year, reduce smoke emissions by about 652.4 tons, sulfur dioxide emissions by about 90.4 tons, nitrogen oxide emissions by about 484.1 tons, carbon monoxide emissions by about 11.9 tons, and carbon dioxide emissions by about 105,779.5 tons. https://wind.imarine.cn/news/98796.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data