CGS Indian River Inlet Boiler Blowers x 6 Piping Fuel Tank
One of 5,959 projects Taiyo tracks in Delaware.
Source: Dodge
- Lockout/tag-out electrical supply power IAW OSHA requirements. 2. Remove all existing interferences. 3. Remove the current standing boiler tank, all applicable fuel lines, and fuel line vent IAW all CG policies and OSHA regulations. 4. Remove all components of the installed boiler in the said boiler room to include but not limited to fuel inlet lines, exhaust ducting, all water piping, and wate
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Oil and Gas, Manufacturing (Industrial)
- Location
- Bethany Beach, Delaware, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CGS Indian River Inlet Boiler Blowers x 6 Piping Fuel Tank
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Lockout/tag-out electrical supply power IAW OSHA requirements. 2. Remove all existing interferences. 3. Remove the current standing boiler tank, all applicable fuel lines, and fuel line vent IAW all CG policies and OSHA regulations. 4. Remove all components of the installed boiler in the said boiler room to include but not limited to fuel inlet lines, exhaust ducting, all water piping, and water tanks vent IAW all CG policies and OSHA regulations. 5. Remove all electrical components direct... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Delaware |
City | Bethany Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Oil and Gas, Manufacturing (Industrial) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
