Chabot Dam Upgrade

Sector: Government • Location: Castro Valley, California, United States of America

Source: East Bay Municipal Utility District

Project
Completed

habot Dam Chabot Reservoir is a 10,350 acre-foot raw water storage facility operated by the East Bay Municipal Utility District (EBMUD) in the cities of San Leandro, Oakland, and Castro Valley in Alameda County, California. The 135-foot high earthen Chabot Dam was initially constructed in 1875 and subsequently upgraded and re-graded in 1892, 1967, and 1980. The reservoir collects water via perenni

Project Information FAQ

Project Information

4 Q
The project “Chabot Dam Upgrade” is an infrastructure initiative in the Government sector, located in Castro Valley, California, United States of America. Taiyo aggregates data on it from East Bay Municipal Utility District.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

habot Dam Chabot Reservoir is a 10,350 acre-foot raw water storage facility operated by the East Bay Municipal Utility District (EBMUD) in the cities of San Leandro, Oakland, and Castro Valley in Alameda County, California. The 135-foot high earthen Chabot Dam was initially constructed in 1875 and subsequently upgraded and re-graded in 1892, 1967, and 1980. The reservoir collects water via perennial creeks and local stormwater runoff draining from the surrounding San Leandro Creek watershed. EBMUD releases water from the reservoir into San Leandro Creek below the dam via an outlet works structure adjacent to the right abutment. There are two emergency spillways that drain into San Leandro Creek in the event of high lake levels after heavy rainfall. The earth dam is located within one quarter mile of the active Hayward Fault. Based on seismic hazard studies, EBMUD worked with the State Department of Water Resources (DWR), Division of Safety of Dams (DSOD) to implement a seismic upgrade to the dam and outlet works structure to improve the performance of the facility during a large earthquake. The project included the construction of a cement deep soil mixing (CDSM) toe buttress and seepage collection trench across the downstream face of the dam in order to stabilize the earthen structure against the large seismic forces expected during the design earthquake. In addition, EBMUD successfully improved the operational reliability of the outlet works by demolishing the seismically vulnerable tower and pavilion, retrofitting the existing access shaft, and replacing the knife gate valves and intake piping needed to manage the water levels within the reservoir. EBMUD also installed new instrumentation to augment the un-going dam monitoring program at the facility. Construction was completed in October 2017. Contact : For after-hours, call EBMUD at 866-403-2683.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data