Chad - Kyabé-Singako Road Surfacing Project
Sector: Raw Materials • Location: Chad
Source: African Development Bank (AfDB)
This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is committed to developing to ensure countrywide coverage and all-season accessibility, and it is a link in the Moundou-Sarh-Abeche loop that will connect the southwest to the main town of the centre-east through the rich farmlands of Moyen Chari and Salamat Regions of the south. The project addresses the issue of facilitation of the country’s inland transport system by bringing the territory out of isolation, but also envisages opening the country up to the rest of the Region through neighbouring Sudan. The project includes ancillary works, namely the construction/improvement of feeder roads, the rehabilitation of socio-economic infrastructure and the development of social infrastructure for women. The expected outcomes are: reduction of overall transport costs in this region with high agro-pastoral potential and improvement of the living conditions of its people through increased access to health and educational facilities and to the country’s key consumer centres. The project implementation period is 4 years, for a total estimated cost of UA 80.298 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |