Chad - Kyabé-Singako Road Surfacing Project

Sector: Raw Materials • Location: Chad

Source: African Development Bank (AfDB)

Project

This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is

Project Information FAQ

Project Information

4 Q
The project “Chad - Kyabé-Singako Road Surfacing Project” is an infrastructure initiative in the Raw Materials sector, located in Chad. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is committed to developing to ensure countrywide coverage and all-season accessibility, and it is a link in the Moundou-Sarh-Abeche loop that will connect the southwest to the main town of the centre-east through the rich farmlands of Moyen Chari and Salamat Regions of the south. The project addresses the issue of facilitation of the country’s inland transport system by bringing the territory out of isolation, but also envisages opening the country up to the rest of the Region through neighbouring Sudan. The project includes ancillary works, namely the construction/improvement of feeder roads, the rehabilitation of socio-economic infrastructure and the development of social infrastructure for women. The expected outcomes are: reduction of overall transport costs in this region with high agro-pastoral potential and improvement of the living conditions of its people through increased access to health and educational facilities and to the country’s key consumer centres. The project implementation period is 4 years, for a total estimated cost of UA 80.298 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data