Chad - Kyabé-Singako Road Surfacing Project
One of 964 projects Taiyo tracks in Chad.
Source: African Development Bank (AfDB)
This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is
- Sector
- Raw Materials, Automotive, Road, Government
- Location
- Chad
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Chad - Kyabé-Singako Road Surfacing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is committed to developing to ensure countrywide coverage and all-season accessibility, and it is a link in the Moundou-Sarh-Abeche loop that will connect the southwest to the main town of the centre-east through the rich farmlands of Moyen Chari and Salamat Regions of the south. The project addresses the issue of facilitation of the country’s inland transport system by bringing the territory out of isolation, but also envisages opening the country up to the rest of the Region through neighbouring Sudan. The project includes ancillary works, namely the construction/improvement of feeder roads, the rehabilitation of socio-economic infrastructure and the development of social infrastructure for women. The expected outcomes are: reduction of overall transport costs in this region with high agro-pastoral potential and improvement of the living conditions of its people through increased access to health and educational facilities and to the country’s key consumer centres. The project implementation period is 4 years, for a total estimated cost of UA 80.298 million. |
Original sector | Transport & Storage |
Budget |
Location
Country | Chad |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Automotive, Road, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Chad
- Chad - Natural Resources Management and Development in the Sudan Region Project
- Chad - The Lac Prefecture Rural Development Project
- MODERNISATION DU RESEAU ROUTIER AU TCHAD
- Chad - Rural, Pastoral and Transhumance Infrastructure Project
- COMPAGNIE SUCRIERE DU TCHAD
- Djermaya CDEN Energy SARL
- Nubian Sandstone Aquifer System
- ETUDE DE PRE-FAISABILITE SPIRULINE
