logo
Project

Chad - Kyabé-Singako Road Surfacing Project

One of 964 projects Taiyo tracks in Chad.

Source: African Development Bank (AfDB)

This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is

Sector
Raw Materials, Automotive, Road, Government
Location
Chad
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Chad - Kyabé-Singako Road Surfacing Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Chad - Kyabé-Singako Road Surfacing Project” is an infrastructure initiative in the Raw Materials sector, located in Chad. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project concerns the Kyabé-Singako road section which is 72.3 km long and is one of the missing links of the Ndjamena-Moundou-Sarh-Kyabé-Am Timan corridor. It is designed because of the severe degradation of the road serving this area, coupled with its high volume of heavy vehicle traffic. The Kyabé-Singako highway forms part of the priority structuring network which the Chadian government is committed to developing to ensure countrywide coverage and all-season accessibility, and it is a link in the Moundou-Sarh-Abeche loop that will connect the southwest to the main town of the centre-east through the rich farmlands of Moyen Chari and Salamat Regions of the south. The project addresses the issue of facilitation of the country’s inland transport system by bringing the territory out of isolation, but also envisages opening the country up to the rest of the Region through neighbouring Sudan. The project includes ancillary works, namely the construction/improvement of feeder roads, the rehabilitation of socio-economic infrastructure and the development of social infrastructure for women. The expected outcomes are: reduction of overall transport costs in this region with high agro-pastoral potential and improvement of the living conditions of its people through increased access to health and educational facilities and to the country’s key consumer centres. The project implementation period is 4 years, for a total estimated cost of UA 80.298 million.

Original sector

Transport & Storage

Budget

Location

Country

Chad

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Automotive, Road, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project