Chad-Cameroon Petroleum Development and Pipeline Project
Completed · Chad
Source: International Finance Corporation (IFC)
The borrowers of the IFC loans will be: (a) TOTCO, a special-purpose company incorporated in Chad as a joint-venture between the private sponsors, and the Government of Chad, which will own and operate the Chad portion of the pipeline export system, and (b) COTCO, a special-purpose company incorporated in Cameroon as a joint-venture between the private sponsors, and the Governments of Cameroon and
- Status
- Closed
- Sector
- Commercial, Government, Oil and Gas
- Location
- Chad
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Chad-Cameroon Petroleum Development and Pipeline Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The borrowers of the IFC loans will be: (a) TOTCO, a special-purpose company incorporated in Chad as a joint-venture between the private sponsors, and the Government of Chad, which will own and operate the Chad portion of the pipeline export system, and (b) COTCO, a special-purpose company incorporated in Cameroon as a joint-venture between the private sponsors, and the Governments of Cameroon and Chad, which will own and operate the Cameroon portion of the pipeline export system. TOTCO and COTCO will transport crude oil to the export-loading terminal through their respective portions of the pipeline export system.The total project cost is estimated at $3.5 billion: $1.5 billion for the oilfield development, to be funded by equity from the private sponsors; and $2 billion for a related pipeline export system, for which the IFC and the International Bank for Reconstruction and Development (IBRD or the World Bank) financing is proposed. The export system is expected to be financed by $100 million IFC A loans, up to $300 million IFC syndicated B loans, $600 million from export credit agencies and commercial banks, a $400 million bond offering, $112 million equity from Chad and Cameroon, to be funded by IBRD and the European Investment Bank (EIB), and $500 million in equity from the private sponsors. |
Original sector | AB - Oil and Gas Production (Includes Development) |
Location
Country | Chad |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Oil and Gas |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
