Chaira Hydroelectric Power Plant Rehabilitation
Sector: Power Generation (CCGT) • Location: Bulgaria
Source: Fakti
The project involves the repair and rehabilitation of hydro units 1 and 3 of the Chaira Hydroelectric Power Plant, which is a key facility for energy security and balancing the electricity system in Bulgaria. The work is supported by Toshiba and the Voith ABB consortium, aiming to restore the operation of this significant energy source by early 2026.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Hydro
- Location
- Bulgaria
- Updated
- 22 Jul 2026
- Source
- Fakti
ConstructChat
Ask ConstructChat about Chaira Hydroelectric Power Plant Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the repair and rehabilitation of hydro units 1 and 3 of the Chaira Hydroelectric Power Plant, which is a key facility for energy security and balancing the electricity system in Bulgaria. The work is supported by Toshiba and the Voith ABB consortium, aiming to restore the operation of this significant energy source by early 2026. |
Original sector | Energy |
Location
Country | Bulgaria |
Source
Source | Fakti |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
