Chaira Pumped-Storage Hydropower Plant Revival
Sector: Hydro • Location: Devin, Bulgaria
Source: Megaproject
Bulgaria's state-owned utility NEK EAD signed a memorandum of understanding with Toshiba International Europe Ltd. to restart operations at the Chaira pumped-storage hydropower plant. The plant, the largest of its kind in Southeastern Europe, has an installed capacity of 864 MW across four units but has been partially out of operation due to aging infrastructure and a turbine accident in 2022. Tos
- Status
- Prospective
- Sector
- Hydro, Wind, Power Transmission, Power Generation (CCGT)
- Location
- Devin, Bulgaria
- Updated
- 22 Jul 2026
- Source
- Megaproject
ConstructChat
Ask ConstructChat about Chaira Pumped-Storage Hydropower Plant Revival
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bulgaria's state-owned utility NEK EAD signed a memorandum of understanding with Toshiba International Europe Ltd. to restart operations at the Chaira pumped-storage hydropower plant. The plant, the largest of its kind in Southeastern Europe, has an installed capacity of 864 MW across four units but has been partially out of operation due to aging infrastructure and a turbine accident in 2022. Toshiba is commissioned to repair Unit 1 and provide technical support for the entire plant to enhance reliability and efficiency. |
Original sector | Energy |
Location
Country | Bulgaria |
City | Devin |
Source
Source | Megaproject |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Bulgaria
- Middle Iskar Cascade SHPPs Phase II
- Ruse project (part of Green Hydrogen @ Blue Danube IPCEI)
- Tsankov Kamak
- Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River
- Studen Kladenets
- Joint Initiatives for Flood Resilience аcross Watersheds in CB Region/ FLOOD RESILIENCE
- Reclaiming rivers for Implementation of Vital and Environment-friendly Renewable energy Source
- Risk Management for Large Scale Infrastructures in the Romanian Bulgarian cross border area
