Chalan Solar + Storage Project
Sector: Energy Storage • Location: California, United States
Source: TipRanks
Origis Energy will build, own, and operate a 65 MWac solar facility paired with a 25 MW / 100 MWh battery system in Kern County, California. The project is supported by $118 million in tax equity financing and has a 20-year power purchase agreement with Pioneer Community Energy. Commercial operation is targeted for the fourth quarter of 2026.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Commercial
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- TipRanks
ConstructChat
Ask ConstructChat about Chalan Solar + Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Origis Energy will build, own, and operate a 65 MWac solar facility paired with a 25 MW / 100 MWh battery system in Kern County, California. The project is supported by $118 million in tax equity financing and has a 20-year power purchase agreement with Pioneer Community Energy. Commercial operation is targeted for the fourth quarter of 2026. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | TipRanks |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Commercial |
Article published date | 2026-04-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
