logo

Chalco Alumina Refinery Project in Guinea

Sector: Oil and Gas • Location: Boffa, Guinea

Source: Discovery Alert

Project
Conditional

The Chalco alumina project in Guinea is a greenfield alumina refinery with a nameplate capacity of 1.2 million tonnes per year. It represents the Aluminium Corporation of China's first overseas alumina processing facility, with a total capital expenditure estimated at approximately $1 billion USD. The project is anchored in the Boffa region of Guinea, leveraging high-grade bauxite deposits with lo

Status
Conditional
Sector
Oil and Gas, Power Generation (CCGT), Warehouse, Water Supply and Storage
Location
Boffa, Guinea
Updated
22 Jul 2026
Source
Discovery Alert

ConstructChat

Ask ConstructChat about Chalco Alumina Refinery Project in Guinea

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Chalco Alumina Refinery Project in Guinea” is an infrastructure initiative in the Oil and Gas sector, located in Boffa, Guinea. Taiyo aggregates data on it from Discovery Alert.

Participants

Not available for this record.

Status

Original status

conditional

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Chalco alumina project in Guinea is a greenfield alumina refinery with a nameplate capacity of 1.2 million tonnes per year. It represents the Aluminium Corporation of China's first overseas alumina processing facility, with a total capital expenditure estimated at approximately $1 billion USD. The project is anchored in the Boffa region of Guinea, leveraging high-grade bauxite deposits with low silica content to improve refinery economics. The refinery development includes significant infrastructure requirements such as power supply, caustic soda logistics, water management, and red mud containment. The project is a vertically integrated downstream extension of Chalco's existing Boffa bauxite mining operation established since 2018.

Original sector

Mining

Budget

Location

Country

Guinea

City

Boffa

Source

Source

Discovery Alert

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT), Warehouse, Water Supply and Storage

Article published date

2026-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project