logo

CHAMBAL I RAJASTHAN

Sector: Road • Location: India

Source: World Bank Group

Project
Closed

The Chambal Command Area Development Project consists of (a) irrigation improvement comprising construction of drainage works on 167,000 ha of the project area; lining of 14 km of canals, where seepage is excessive; works for increasing capacity of 850 km of canals, and construction of 160 control structures and of about 4,000 tertiary outlets; on-farm development by construction of irrigation, dr

Project Information FAQ

Project Information

5 Q
The project “CHAMBAL I RAJASTHAN” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Chambal Command Area Development Project consists of (a) irrigation improvement comprising construction of drainage works on 167,000 ha of the project area; lining of 14 km of canals, where seepage is excessive; works for increasing capacity of 850 km of canals, and construction of 160 control structures and of about 4,000 tertiary outlets; on-farm development by construction of irrigation, drainage ditches and cart-tracks to serve about 50,000 ha of irrigated land, realignment of farm boundaries for improved irrigation, drainage and road facilities, and landshaping to ensure efficient irrigation; (b) road improvements comprising work on about 250 km of roads; (c) afforestation and erosion control; (d) construction of project organization buildings and minor flood protection and silt removal works; (e) strengthening of agricultural research and extension, procurement of 15,000 nutrient tons of fertilizer and its distribution to project farmers; (f) provision of measures for aquatic weed control in the major canals; (g) training of CAA staff in on-farm development; (h) carrying out of further studies of hydrology, reservoir system operations, consumptive use, drainage design, construction methods for on-farm development, crab ecology, and aquatic weed control, and a feasibility study.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data