Chambers Street Bridge Seismic Retrofit
Sector: Bridge • Location: Eugene, Oregon, United States
Source: KMTR
The City of Eugene Public Works Engineering division completed the seismic retrofit of the Chambers Street bridge just north of Second Avenue. The project began in March 2025, faced delays due to permits needed to access Union Pacific property, resumed in fall 2025, and finished on May 22, 2026, including restriping the street surface. Roosevelt Boulevard has been reopened to through traffic with
- Status
- Closed
- Sector
- Bridge, Road
- Location
- Eugene, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- KMTR
ConstructChat
Ask ConstructChat about Chambers Street Bridge Seismic Retrofit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Eugene Public Works Engineering division completed the seismic retrofit of the Chambers Street bridge just north of Second Avenue. The project began in March 2025, faced delays due to permits needed to access Union Pacific property, resumed in fall 2025, and finished on May 22, 2026, including restriping the street surface. Roosevelt Boulevard has been reopened to through traffic with all travel lanes returned to normal. |
Original sector | Public Works |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Eugene |
Source
Source | KMTR |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Atlas Air Worldwide and Titan Aviation Holdings Announce Financing Facilities with CDPQ, BNP Paribas, and volofin
- Route 29 Tunnel, Trenton, NJ
- Ortega Highway Interchange Replacement Project
- Elgin O’Hare Western Access Project, Illinois
- Queen Elizabeth Way Widening
- I-485 Charlotte Outer Loop, North Carolina
- Kosciuszko Bridge Replacement Project, New York, US
- Complete 540 (Triangle Expressway Southeast Extension), North Carolina
