Chameliya–Jauljibi 220 kV Double-Circuit Transmission Line
Sector: Power Generation (CCGT) • Location: Chameliya, Nepal
Source: The Hans India
The Chameliya (Nepal)–Jauljibi (India) 220 kV double-circuit transmission line project has had its Detailed Project Report (DPR) approved, with a target to complete construction by December 2028. This project aims to enhance cross-border electricity trade between Nepal and India.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Chameliya, Nepal
- Updated
- 22 Jul 2026
- Source
- The Hans India
ConstructChat
Ask ConstructChat about Chameliya–Jauljibi 220 kV Double-Circuit Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Chameliya (Nepal)–Jauljibi (India) 220 kV double-circuit transmission line project has had its Detailed Project Report (DPR) approved, with a target to complete construction by December 2028. This project aims to enhance cross-border electricity trade between Nepal and India. |
Original sector | Energy |
Location
Country | Nepal |
City | Chameliya |
Source
Source | The Hans India |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
