Champlain Hudson Power Express
Sector: Hydro • Location: New York City, New York, United States
Source: Utility Dive
A $6-billion, 1,250-MW merchant transmission line delivering hydropower from Quebec, Canada to New York City. The high-voltage, direct-current buried transmission line spans more than 300 miles from the Hertel substation in Quebec to the Astoria Annex Substation in Queens, New York. It will deliver 10.4 TWh a year from Hydro-Québec under a 25-year contract with the New York State Energy Research a
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Power Transmission
- Location
- New York City, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Utility Dive
ConstructChat
Ask ConstructChat about Champlain Hudson Power Express
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $6-billion, 1,250-MW merchant transmission line delivering hydropower from Quebec, Canada to New York City. The high-voltage, direct-current buried transmission line spans more than 300 miles from the Hertel substation in Quebec to the Astoria Annex Substation in Queens, New York. It will deliver 10.4 TWh a year from Hydro-Québec under a 25-year contract with the New York State Energy Research and Development Authority. The project is owned by Blackstone-backed Transmission Developers Inc. under CHPE LLC and is set to begin operation by May 1, 2026. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | Utility Dive |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Power Transmission |
Article published date | 2026-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
