Chancay Port Terminal Project in Peru
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The project involves the development of a multipurpose port terminal in Chancay, Lima, Peru.The port will handle containerized cargo, general cargo, non-mineral bulk cargo, liquid cargo, and rolling cargo. The scope of work includes the development of the following 3 components:Port Operational Zone which includes the docks, breakwaters, maritime entry channels, storage areas for bulk and rolling
- Status
- Closed
- Sector
- Bridge, Residential, Road, Seaport, Warehouse, Tunnel, Commercial
- Location
- Lima, Peru
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Chancay Port Terminal Project in Peru
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a multipurpose port terminal in Chancay, Lima, Peru.The port will handle containerized cargo, general cargo, non-mineral bulk cargo, liquid cargo, and rolling cargo. The scope of work includes the development of the following 3 components:Port Operational Zone which includes the docks, breakwaters, maritime entry channels, storage areas for bulk and rolling cargo containers, maintenance areas and workshops;The entrance Complex includes the vehicular foreport, entrance gates to the terminal, customs inspection area, administrative offices and logistics and support services areas; andA 1.8 km Underground Viaduct Tunnel will connect the Entrance Complex with the Port Operational Zone constituting a segregated and exclusive road corridor for cargo traffic related to the port operation. It has 3 vehicular lanes, two conveyor belts for solid bulks, and multiproduct pipes for liquid bulks.The project will be developed in phases, Phase 1 of the terminal will have 4 berths, of which 2 are multi-purpose berths and 2 are container berths with a total annual designed capacity of 1 million TEU. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Peru |
State | Lima |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Bridge, Residential, Road, Seaport, Warehouse, Tunnel, Commercial |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
