Chandler Boulevard Cycletrack Gap
Sector: Cement • Location: Playa Del Rey, California, United States of America
Source: Dodge USA
This project will construct a low-stress bikeway connection to close a 3.1-mile gap between the Orange Line and Chandler bike paths. This will create a 21-mile continuous bike route from Chatsworth to Downtown Burbank. The project improvements include construction of multiple uni-directional curb ramps, a new transit platform, a temporary ZILCA transit platform, removal of 3 concrete islands, sign
- Status
- Closed
- Sector
- Cement, Consumer Products, Road, Car parking, Government, Automotive, Commercial
- Location
- Playa Del Rey, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chandler Boulevard Cycletrack Gap
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Design Development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will construct a low-stress bikeway connection to close a 3.1-mile gap between the Orange Line and Chandler bike paths. This will create a 21-mile continuous bike route from Chatsworth to Downtown Burbank. The project improvements include construction of multiple uni-directional curb ramps, a new transit platform, a temporary ZILCA transit platform, removal of 3 concrete islands, signal work, street lighting work, and striping work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Playa Del Rey |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Consumer Products, Road, Car parking, Government, Automotive, Commercial |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
