logo

Chandrayaan 3

Sector: Aerospace & Defense • Location: Thailand

Source: Aerospace Technology

Project
Closed

ISRO plans to launch Chandrayaan 3 between 2020 and 2021. Credit: Shutterstock / Raymond Cassel. Chandrayaan 3 will use the existing orbiter of Chandrayaan 2. Credit: Shutterstock / Raymond Cassel. ISRO aims to explore the South Pole of the moon for presence of water through its lunar space missions. Shutterstock / Nostalgia for Infinity. India’s third lunar exploration mission, Chandrayaan 3 was

Project Information FAQ

Project Information

3 Q
The project “Chandrayaan 3” is an infrastructure initiative in the Aerospace & Defense sector, located in Thailand. Taiyo aggregates data on it from Aerospace Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

ISRO plans to launch Chandrayaan 3 between 2020 and 2021. Credit: Shutterstock / Raymond Cassel. Chandrayaan 3 will use the existing orbiter of Chandrayaan 2. Credit: Shutterstock / Raymond Cassel. ISRO aims to explore the South Pole of the moon for presence of water through its lunar space missions. Shutterstock / Nostalgia for Infinity. India’s third lunar exploration mission, Chandrayaan 3 was announced following the Chandrayaan 2 failure to soft-land on the moon in 2019. The former mission aimed to explore the moon’s South Pole. Indian Space Research Organisation (ISRO) will manage the Chandrayaan 3 mission that has already been approved by the Indian Government. The Indian Space Agency estimates Chandrayaan 3 to cost approximately Rs2.5bn ($35m), excluding the launch vehicle that will cost additional Rs3.5bn ($50m). ISRO plans to launch Chandrayaan-3 between 2020 and 2021. The new mission’s goal is to land on the lunar South Pole, similar to its predecessor. The launch will be performed using the GSLV Mk III rocket. The mission configuration will include a lander and a rover. The existing Chandrayaan 2 orbiter will be used, reducing the overall mission cost. Weighing 2,379kg, the orbiter carries five instruments and has a mission life of seven years. It is mounted with solar panels that can generate 1kW of electrical power. GSLV Mark 3 (GSLV Mk III) is a three-stage heavy-lift launch vehicle that was also used for launching the Chandrayaan 2 in 2019. It consists of a core liquid booster (L110), two solid rocket boosters (S200) on each side and a cryogenic upper stage (C25). India’s biggest cryogenic engine CE-20 powers the upper stage. Two Vikas engines that burn 110t of fuel power the core stage. India’s first lunar exploration mission Chandrayaan 1 was launched in October 2008 and successfully performed chemical, mineralogical and photo-geologic mapping of the moon. It orbited 100km above the lunar surface and carried 11 payloads to perform its mission. Chandrayaan 1 detected water molecules near lunar poles. India’s second lunar exploration mission, Chandrayaan 2, which ISRO considered as highly complex, aimed to explore the South Pole, anticipating that chances of water presence could be higher in that area. The lander used for the Chandrayaan 2 mission, Vikram crashed on the moon after ground stations lost communication with it. The contact was lost after the lander descended to 2.1km. India successfully launched multiple low-cost space missions such as the Mars Orbiter Mission (MoM), also known as Mangalyaan, and Chandrayaan 1 and aims to launch more. ISRO also plans to launch manned and unmanned missions to space under India’s ambitious Gaganyaan programme that was announced in 2018 and has a budget approval for Rs100bn ($1.4bn). Russia will provide training support to the crew planned to be sent as part of the manned mission. Four pilots from the Indian Air Force (IAF) were selected, while up to three will be sent to space. The unmanned mission will use a lady robot called Vyomamitra. The manned space mission under Gaganyaan is scheduled for 2022. Aditya L-1, India’s first solar observatory mission, is expected to be launched in 2020. It will study the solar corona.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data