logo
ProjectCancelled

Changchun Wastewater Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

In January of 2000, China Water Company (CWC) was awarded a 21-year BOT contract for the Changchun Beijiao Wastewater Treatment Plant and associated facilities. The objective of the project was increasing the wastewater treatment capacity of Changchun municipality and reducing the water pollution problem in the lower reaches of the Songhua River, the major source of potable water for a number of

Status
Closed
Sector
Commercial, Water Supply and Storage, Government, Waste Processing and Treatment
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Changchun Wastewater Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Changchun Wastewater Project” is an infrastructure initiative in the Commercial sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In January of 2000, China Water Company (CWC) was awarded a 21-year BOT contract for the Changchun Beijiao Wastewater Treatment Plant and associated facilities. The objective of the project was increasing the wastewater treatment capacity of Changchun municipality and reducing the water pollution problem in the lower reaches of the Songhua River, the major source of potable water for a number of cities in North East China. The production of approximately 390,000 tons of sewage/day began in January 2001. To implement the contract, China Water Changchun Company was created as the project company, a joint venture formed by China Water Company (CWC) and the state-owned Changchun Urban Drainage Company (exact shares were undisclosed). As of 2002, CWC itself was owned by Thames Water (a subsidiary of RWE) (48.8%) and Sime Darby Bhd. of Malaysia (33.3%). The JV was responsible for building and operating of the Changchun Beijiao Wastewater Treatment Plant which included 1) a coarse screen and pump station with a processing capacity of 10.44 cubic meters per second, 2) fine screen and grit chamber with a processing capacity of 5.42 cubic meters per second, 3) primary wastewater treatment system and corresponding sludge treatment system with a processing capacity of 5.42 cubic meters per second and 4) effluent discharge system. Total investment for the project was estimated at US$32 million. According to a 2004 report, the Changchun Urban Drainage Company had delayed the wastewater fee to CWC from the beginning of 2002 and had completely refused any further payment to CWC from March 2003. The accumulated unpaid wastewater fee had reportedly reached more than 90 million RMB by 30 September 2003. The Changchun Urban Drainage Company claimed it could not collect enough wastewater fees to satisfy the requirement stated in the contract. The state-owned company also claimed that since the project was set up with a guranteed "rate of return" to the private investor, such a contract was illegal under Chinese federal law and could therefore be canceled. The contract was terminated in February 2004. None None

Original sector

Water and sewerage

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Government, Waste Processing and Treatment

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project