logo

Changchun Wastewater Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Cancelled

In January of 2000, China Water Company (CWC) was awarded a 21-year BOT contract for the Changchun Beijiao Wastewater Treatment Plant and associated facilities. The objective of the project was increasing the wastewater treatment capacity of Changchun municipality and reducing the water pollution problem in the lower reaches of the Songhua River, the major source of potable water for a number of

Project Information FAQ

Project Information

4 Q
The project “Changchun Wastewater Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In January of 2000, China Water Company (CWC) was awarded a 21-year BOT contract for the Changchun Beijiao Wastewater Treatment Plant and associated facilities. The objective of the project was increasing the wastewater treatment capacity of Changchun municipality and reducing the water pollution problem in the lower reaches of the Songhua River, the major source of potable water for a number of cities in North East China. The production of approximately 390,000 tons of sewage/day began in January 2001. To implement the contract, China Water Changchun Company was created as the project company, a joint venture formed by China Water Company (CWC) and the state-owned Changchun Urban Drainage Company (exact shares were undisclosed). As of 2002, CWC itself was owned by Thames Water (a subsidiary of RWE) (48.8%) and Sime Darby Bhd. of Malaysia (33.3%). The JV was responsible for building and operating of the Changchun Beijiao Wastewater Treatment Plant which included 1) a coarse screen and pump station with a processing capacity of 10.44 cubic meters per second, 2) fine screen and grit chamber with a processing capacity of 5.42 cubic meters per second, 3) primary wastewater treatment system and corresponding sludge treatment system with a processing capacity of 5.42 cubic meters per second and 4) effluent discharge system. Total investment for the project was estimated at US$32 million. According to a 2004 report, the Changchun Urban Drainage Company had delayed the wastewater fee to CWC from the beginning of 2002 and had completely refused any further payment to CWC from March 2003. The accumulated unpaid wastewater fee had reportedly reached more than 90 million RMB by 30 September 2003. The Changchun Urban Drainage Company claimed it could not collect enough wastewater fees to satisfy the requirement stated in the contract. The state-owned company also claimed that since the project was set up with a guranteed "rate of return" to the private investor, such a contract was illegal under Chinese federal law and could therefore be canceled. The contract was terminated in February 2004. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data