CHANGCHUN WAT SUPP &
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The main objectives of the project are to improve water supply in Changchun to meet the domestic needs of the urban population, support industrial growth, and control urban water pollution. The physical works include: (a) construction of a water transmission pipeline to convey water from the Second Songhua River to an impounding reservoir currently serving Changchun; construction of pumping stat
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CHANGCHUN WAT SUPP &
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the project are to improve water supply in Changchun to meet the domestic needs of the urban population, support industrial growth, and control urban water pollution. The physical works include: (a) construction of a water transmission pipeline to convey water from the Second Songhua River to an impounding reservoir currently serving Changchun; construction of pumping stations, expansion and improvement of water treatment facilities and expansion of the capacity of the water distribution system; (b) construction of a trunk interceptor sewer and a primary sewage treatment plant and procurement of equipment and instruments for environmental quality monitoring and control; and (c) technical assistance to assist with design and construction supervision, to furnish management support to the water and sewerage companies including the preparation of a staff training program, and to implement a hazardous waste study. Institutionally, the project will reinforce the Changchun Water Supply Company, develop the Changchun Sewerage Company, strengthen water pollution control, establish appropriate pricing policies, improve operation practices, promote measures for water conservation and improve personnel management, including training of staff. |
Original sector | FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
