Changi Water Reclamation Plant is located at the eastern end of Singapore. It is one of the largest and most technologically advanced reclamation facilities in the world. An inside view of completed deep tunnel sewerage system (DTSS). Phase one of DTSS was completed in 2008. Influent pumping station (IPS) at Changi Water Reclamation Plant. The 50m-deep IPS has two pumping stations and a coarse scr

Project Information FAQ

Project Information

4 Q
The project “Changi Water Reclamation Plant, Changi” is an infrastructure initiative in the Chemical (Industrial) sector, located in Thailand. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Changi Water Reclamation Plant is located at the eastern end of Singapore. It is one of the largest and most technologically advanced reclamation facilities in the world. An inside view of completed deep tunnel sewerage system (DTSS). Phase one of DTSS was completed in 2008. Influent pumping station (IPS) at Changi Water Reclamation Plant. The 50m-deep IPS has two pumping stations and a coarse screen shaft. The Singapore plant is spread over 32ha of land. The Changi Water Reclamation Plant is built partially underground and stacked for maximum compactness and land use. Changi Water Reclamation Plant (CWRP), located at the eastern end of Singapore, is one of the largest and most advanced reclamation facilities in the world. It was opened by the country’s Prime Minister Lee Hsien Loong in June 2009. The ground breaking ceremony for the project was held in May 2001. The plant has a capacity to treat 176 million gallons (800,000 cubic meters) of used water a day. The plant will undergo phased expansion until its capacity reaches 528 million gallons of water a day. The plant is spread over 32ha of land and is operated by Singapore’s Public Utilities Board (PUB). CWRP is part of the S$3.65bn (nearly $3bn) deep tunnel sewerage system (DTSS). DTSS is an important component of Singapore’s water management strategy. It allows every drop of used water to be collected, treated and further purified into NEWater, Singapore’s own brand of reclaimed water. The DTSS, which is being developed in two phases, includes two large, deep tunnels, two centralised water reclamation plants, deep sea outfall pipes and a link sewer network. Phase one of DTSS was completed in 2008. In addition to the CWRP, phase one includes a 48km tunnel from Kranji to Changi, 60km of link sewer and two 5km-long deep sea outfall pipes. Phase two of the DTSS will consist of the south tunnel and its network of link sewers, leading to a water reclamation plant in the south-western part of Singapore and another deep sea outfall. It is expected to be developed by 2016. The existing pumping stations and reclamation plants are expected to be out of service by 2045. CWRP is built partially underground and stacked for maximum compactness and land use. The plant includes an influent pumping station (IPS), an effluent pumping station and a liquids processing and solids processing systems. Used water from the DTSS is pumped to the IPS before being transferred to headworks for treatment. The 50m-deep IPS has two pumping stations and a coarse screen shaft. Each pumping station is installed with five influent pumps with combined pumping capacity of 400,000CMD. The IPS receives used water from a sewerage tunnel. The treated effluent is discharged into the deep sea using a twin 3m diameter outfall pipe which is about 5km long and 35m below sea level. In February 2011, PUB decided to expand the plant to treat an additional 22 million gallons (60,000 cubic meters a day (cmd)). Black & Veatch has been selected to provide engineering design services for the project. Phase two is proposed to include expansion of effluent pumping station, anaerobic digester and membrane plant construction. Tenders for construction and installation works were closed in July 2011 and are currently being evaluated. The expansion project is expected to be completed by 2016. Captured wastewater at the CWRP is treated by removing the solids and nutrients present in the used water. The treated water is then returned to the environment or transferred to NEWater factories for further processing. At NEWater factories, the reclaimed water is purified further and made suitable for drinking using advanced membrane technologies. CWRP uses liquids and solids processes to treat the wastewater. The incoming used water is first fed into coarse screens for the removal of large debris. The water is then transferred to headworks where smaller particles, grit, oil and grease are removed by using fine screens. Heavy particles present in wastewater settle down at the bottom in the form of sludge while passing through double-deck sedimentation tanks. These solids are removed by moving scrappers. After the removal of heavier organic particles, the wastewater is fed into bioreactors where impurities and colloidal organic matter are broken down by using micro-organisms. The resultant used water is sent to secondary sedimentation tanks for the activated sludge or heavy micro-organisms to settle down. These are recycled to the bioreactors and some are sent for solids processing. From the secondary sedimentation tanks, the treated used water is discharged into the Straits of Singapore through the 5km long outfall pipes. NEWater is considered the pillar of Singapore’s water sustainability and currently meets 30% of the total water demand in the country. The NEWater production process uses advanced dual membrane and ultraviolet technologies to further treat the reclaimed water.At present, there are four NEWater factories in Singapore. The Sembcorp NEWater plant, built on the rooftop of the CWRP, is the latest and the largest one. It was opened in May 2010 and has a capacity of 50mgd. Detailed design and tendering services for the plant were provided by CH2M HILL and CPG Consultants. ABB supplied ten ACS 1000 medium voltage variable speed drives to control the pumps of the influent pumping stations. The general contractors for the project were Lum Chang Building Contractors, Koh Brothers, Sembcorp Engineers and Constructors, Keppel Engineering, United Engineers and Voltas. Siemens supplied two odour control trains, a dual-bed, horizontal-flow V-bank-style carbon adsorber, a ‘unitary multistage’ chemical scrubber system and coarse-bubble diffuser systems. Other suppliers included BASF, Festo and Straub. BBR group was contracted to construct two non-process buildings.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data