Changing Tides: A Virtual Field Trip
Archived · United States of America
Source: Grants.gov
Bringing some of the fascinating, remote resources and research along the Katmai and Lake Clark coastlines into classrooms around the world, we will capitalize on the Changing Tides project, an ongoing Coastal Settlement-funded collaboration centered at Lake Clark and Katmai National Parks, to create a â¿¿virtual field trip (VFT),â¿ a long-term, broad-reaching curriculum-based outreach product.
- Status
- Closed
- Sector
- Broadband, Car parking, Education, Government, Rail, Automotive, Telecommunications
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Changing Tides: A Virtual Field Trip
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bringing some of the fascinating, remote resources and research along the Katmai and Lake Clark coastlines into classrooms around the world, we will capitalize on the Changing Tides project, an ongoing Coastal Settlement-funded collaboration centered at Lake Clark and Katmai National Parks, to create a â¿¿virtual field trip (VFT),â¿ a long-term, broad-reaching curriculum-based outreach product. The VFT for Changing Tides will consist of media-rich, curriculum-based web pages and lesson plans that allow any classroom in the world with web access to learn about and learn from this project. For those classrooms without the necessary bandwidth, this VFT will be available on a DVD or USB flash drive. The VFT will be targeted at grades 5-8 and will illuminate important connections between the marine and terrestrial ecosystems while also highlighting the vulnerability of coastal resources to climate change and some of the associated consequences for terrestrial resources. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Broadband, Car parking, Education, Government, Rail, Automotive, Telecommunications |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
