logo

Changjiang/Pearl River Watershed Rehabilitation Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Closed

The objectives of the Changjiang and Pearl River Watershed Rehabilitation Project are to improve farmer's livelihoods and protect the environment in poor and highly degraded watersheds of the Changjing and Pearl River Basins in China by promoting an integrated and replicable model of sustainable rural development. Through a participatory design process activities will be packaged into an integrat

Project Information FAQ

Project Information

5 Q
The project “Changjiang/Pearl River Watershed Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Changjiang and Pearl River Watershed Rehabilitation Project are to improve farmer's livelihoods and protect the environment in poor and highly degraded watersheds of the Changjing and Pearl River Basins in China by promoting an integrated and replicable model of sustainable rural development. Through a participatory design process activities will be packaged into an integrated set of interventions for individual subwatersheds. These activities are categorized into three components. The first component, entitled soil and water conservation, consists of predominantly physical investments for soil and water conservation primarily of public interest including minimum capital farmland, sediment retention structures, afforestation and vegetative cover, and village infrastructure. The second component, entitled livelihood improvement, consists of predominantly physical investments designed to improve the income of farmers including: terracing of slope land, horticulture and fruit and nut trees, grasslands, livestock development, irrigation and drainage and renewable energy supply. The third component, entitled project management and support services, will ensure the participatory design process with inclusion of vulnerable groups, the quality implementation of activities under the first two components, the right institutional setting for sustainable operation and maintenance of project activities, the mitigation of environmental and social risks, and strong project management including monitoring and evaluation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data