Changjiang/Pearl River Watershed Rehabilitation Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objectives of the Changjiang and Pearl River Watershed Rehabilitation Project are to improve farmer's livelihoods and protect the environment in poor and highly degraded watersheds of the Changjing and Pearl River Basins in China by promoting an integrated and replicable model of sustainable rural development. Through a participatory design process activities will be packaged into an integrat
- Status
- Closed
- Sector
- Water Supply and Storage, Biomass, Raw Materials, Waste Processing and Treatment, Hydro, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Changjiang/Pearl River Watershed Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Changjiang and Pearl River Watershed Rehabilitation Project are to improve farmer's livelihoods and protect the environment in poor and highly degraded watersheds of the Changjing and Pearl River Basins in China by promoting an integrated and replicable model of sustainable rural development. Through a participatory design process activities will be packaged into an integrated set of interventions for individual subwatersheds. These activities are categorized into three components. The first component, entitled soil and water conservation, consists of predominantly physical investments for soil and water conservation primarily of public interest including minimum capital farmland, sediment retention structures, afforestation and vegetative cover, and village infrastructure. The second component, entitled livelihood improvement, consists of predominantly physical investments designed to improve the income of farmers including: terracing of slope land, horticulture and fruit and nut trees, grasslands, livestock development, irrigation and drainage and renewable energy supply. The third component, entitled project management and support services, will ensure the participatory design process with inclusion of vulnerable groups, the quality implementation of activities under the first two components, the right institutional setting for sustainable operation and maintenance of project activities, the mitigation of environmental and social risks, and strong project management including monitoring and evaluation. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Raw Materials, Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
