logo
ProjectClosed

Changjiang/Pearl River Watershed Rehabilitation Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The objectives of the Changjiang and Pearl River Watershed Rehabilitation Project are to improve farmer's livelihoods and protect the environment in poor and highly degraded watersheds of the Changjing and Pearl River Basins in China by promoting an integrated and replicable model of sustainable rural development. Through a participatory design process activities will be packaged into an integrat

Status
Closed
Sector
Water Supply and Storage, Biomass, Raw Materials, Waste Processing and Treatment, Hydro, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Changjiang/Pearl River Watershed Rehabilitation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Changjiang/Pearl River Watershed Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Changjiang and Pearl River Watershed Rehabilitation Project are to improve farmer's livelihoods and protect the environment in poor and highly degraded watersheds of the Changjing and Pearl River Basins in China by promoting an integrated and replicable model of sustainable rural development. Through a participatory design process activities will be packaged into an integrated set of interventions for individual subwatersheds. These activities are categorized into three components. The first component, entitled soil and water conservation, consists of predominantly physical investments for soil and water conservation primarily of public interest including minimum capital farmland, sediment retention structures, afforestation and vegetative cover, and village infrastructure. The second component, entitled livelihood improvement, consists of predominantly physical investments designed to improve the income of farmers including: terracing of slope land, horticulture and fruit and nut trees, grasslands, livestock development, irrigation and drainage and renewable energy supply. The third component, entitled project management and support services, will ensure the participatory design process with inclusion of vulnerable groups, the quality implementation of activities under the first two components, the right institutional setting for sustainable operation and maintenance of project activities, the mitigation of environmental and social risks, and strong project management including monitoring and evaluation.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Raw Materials, Waste Processing and Treatment, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project