Changle County Water Project
Sector: Commercial • Location: Shandong, China
Source: World Bank Group
In July of 2003, Salcon, through its wholly owned subsidiary Salcon Water, was awarded a 50-year concession contract for a water supply project in Changle county, Weifang city, Shandong province. The contract covered all aspects of potable water supply including construction, operation and maintenance as well as downstream activities in the form of billings and collection. The project was to pro
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Shandong, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Changle County Water Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In July of 2003, Salcon, through its wholly owned subsidiary Salcon Water, was awarded a 50-year concession contract for a water supply project in Changle county, Weifang city, Shandong province. The contract covered all aspects of potable water supply including construction, operation and maintenance as well as downstream activities in the form of billings and collection. The project was to provide potable water to a total population of about 600,000 people, of which 100,000 were living in urban centres consisting of 15 townships and an Economic Development Zone. To implement the contract, Shangdong Changle Salcon Water Supply Company (SCSW) was created as the project company in which Salcon took a 75% stake while the local state-owned Changle County General Water Supply Company (CCGWSC) held the remainder. In December of 2005, Salcon Water acquired the remaining 25% registered capital of SCSW for a total cash purchase consideration of RMB 3.89 million, raising its stake in the project to 100%. SCSW was to take over the existing 20,000 cubic meters per day capacity water treatment plant as well as build a new 20,000 cubic meters per day capacity water treatment plant. A total capacity of 40,000 cubic meters per day was expected by 2007. Financial close was achieved in December of 2003 when Salcon finalized its RMB 5.5 million equity injection into the project company. The project began on January 1, 2004. None None |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
State | Shandong |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant